How to claim on a contractors all risk policy

To claim under a Contractors All Risk policy, immediately secure the site, notify your internal risk officer and the insurer’s 24‑hour hotline within an hour, then compile all original invoices, contracts, progress logs and incident reports before the surveyor arrives. Prompt, documented actions protect the payout you deserve.
- Prompt site security limits further loss and shows good faith.
- Notify the insurer within the first hour to avoid non‑compliance penalties.
- Prepare a complete document packet before the surveyor’s visit to speed settlement.
When a site accident or equipment loss occurs, every hour you wait can shrink the settlement you deserve. The first few minutes decide whether the insurer sees you as a responsible client or a careless one. In the heat of a collapse, a fire, or a theft, the instinct is to call the crew, arrange repairs and move on. But the policy’s claim clause activates the moment loss is evident, and the insurer will later check whether you followed the exact sequence we outline. Miss a step, and the surveyor may flag non‑compliance, the adjuster can invoke the average clause, and the settlement may be reduced or outright denied.
Initial actions to safeguard the site
A Contractor’s All Risk (CAR) policy bundles material loss, third‑party liability and delay in start‑up coverage for construction projects. It is a “all‑risk” contract because it covers any fortuitous loss unless specifically excluded. The policy wording, the schedule of values, and the risk register you submitted at inception are the reference points the insurer will use to measure your loss. Understanding what the insurer expects helps you preserve the full sum insured and avoid the dreaded “average” reduction that kicks in when the sum insured falls below 85 % of the declared value.
Mandatory notification to internal risk officer
Step 1, Secure the site and preserve evidence. As soon as the incident occurs, stop work only if safety demands it, then cordon off the area, photograph the damage from all angles, and record the time, weather, and any witnesses. If fire broke out, retain the fire‑brigade report; if a crane toppled, keep the operator’s logbook and the equipment’s maintenance record. Do not move or dispose of debris until the insurer’s surveyor arrives, unless leaving it poses an immediate hazard. This preservation is the foundation of a credible claim; any tampering will be noted in the survey report and can trigger a denial.
Step 2, Notify the insurer within the policy‑prescribed period. Most CAR policies require notice “as soon as practicable” and certainly before the loss escalates. Call the dedicated claims helpline, note the reference number, and follow up with a written notice-email or fax-within 24 hours. In the same communication, attach the initial photographs, the incident log, and a brief description of what happened. Delaying beyond the stipulated period, even by a day, gives the insurer grounds to argue that you failed to mitigate loss, which can lead to a reduced payout.
Assembling the core claim documentation
Step 3, Inform the project’s key stakeholders in order. First, alert the client or project owner, because many contracts stipulate that the contractor must obtain the owner’s consent before engaging a surveyor or commencing repairs. Next, inform the architect or engineer of record, as their assessment may be required for structural damage. Finally, notify any subcontractors whose work is directly affected; their written acknowledgment of the loss will become part of the claim file. Skipping any of these notifications can be interpreted as a breach of the contract and may be cited by the insurer to limit liability.
Step 4, Gather the documentary pack the insurer will demand. The core list includes: the original policy schedule, the sum‑insured declaration, the detailed bill of quantities (BOQ) or schedule of values, the latest progress claim, and the original risk register. Add the site diary entries for the days surrounding the loss, the contractor’s insurance certificates for subcontractors, and any statutory approvals (e.g., municipal clearance). For equipment loss, provide purchase invoices, registration certificates, and the last service invoice. The insurer’s claim form must be completed in full; any blank field is treated as a non‑disclosure and can trigger a reduction.
Step 5, Prepare for the surveyor’s visit. The insurer will dispatch a loss adjuster or an independent surveyor to assess the damage. Their checklist focuses on three things: the cause of loss, the extent of physical damage, and the adequacy of the risk mitigation measures you had in place. They will verify that the loss is fortuitous, not due to negligence, and that the sum insured matches the declared value at the time of loss. Bring all the documents gathered in Step 4, plus a copy of the site safety plan and any recent inspection reports. The surveyor will also inspect the storage conditions of materials; poor stacking or inadequate fire protection can be used to argue contributory negligence.
Step 6, Avoid common pitfalls that trigger the average clause or rejection. Under‑insurance is the most frequent error; if the sum insured is below 85 % of the project’s declared value, the insurer will apply the average clause and reduce the payout proportionally. Ensure that any change orders or value additions are reflected in a revised sum insured before they occur. Another trap is failing to submit a revised schedule of values after a major design change; the insurer will then compare the loss against an outdated figure and may deem the claim partially ineligible. Also, never submit estimates from unapproved contractors; the insurer expects quotations from firms listed in the original tender.
Step 7, Review the settlement draft carefully. Once the surveyor’s report is processed, the insurer will issue a settlement letter detailing the approved loss amount, the deduction (if any), and the basis for each line item. Compare this against your own loss calculation, the BOQ, and the policy schedule. Pay particular attention to any “average” deduction noted; if the insurer has applied it, verify whether the sum insured truly fell below the 85 % threshold at the date of loss. If you spot a discrepancy-say, a missing piece of equipment that was listed in the original risk register but omitted from the settlement-raise it immediately.
Step 8, Escalate if the offer looks wrong. Write a formal objection to the insurer’s claims officer within the grievance window specified in the policy, usually 30 days from receipt of the settlement letter. Attach a revised loss statement, the original purchase invoices, and a copy of the surveyor’s report highlighting the error. If the insurer maintains the position, invoke the internal dispute resolution mechanism and request a meeting with the senior claims manager. Should the internal route fail, you can approach the IRDAI’s grievance redressal cell, but only after exhausting the insurer’s own process.
Step 9, Document every interaction for future reference. Keep a chronological file of all emails, letters, phone call logs (with dates, times, and names of representatives), and courier receipts. This paper trail becomes vital if the dispute escalates to arbitration or court, where the insurer will be required to prove that you complied with all policy conditions. Missing a single acknowledgment can be used to argue that you did not act “as soon as practicable,” weakening your position.
Step 10, Close the claim with a post‑mortem. After settlement, conduct a root‑cause analysis with your project team and update the risk register accordingly. Adjust the sum insured for any future phases of the project to reflect the revised exposure, and inform the insurer of the updated values before the next claim period begins. This proactive step not only prevents future average‑clause reductions but also demonstrates to the insurer that you are a diligent risk manager, which can smooth the path for any subsequent claims.
By following these steps in the exact order, you protect the full value of your CAR policy, keep the insurer from invoking average or negligence clauses, and ensure that any settlement offered truly reflects the loss you suffered. The difference between a hurried, incomplete claim and a methodical, documented one can be the difference between a modest payout and a full recovery of your project’s value.
| Step | Primary Action | Typical Outcome |
|---|---|---|
| Secure Site | Barricade, protect assets, photograph damage | Shows good faith, limits further loss |
| Notify Insurer | Call 24‑hour hotline, record reference | Prevents non‑compliance penalty |
| Prepare Documents | Gather policy, invoices, logs, FIR | Accelerates survey and settlement |
In practice, insurers often request the original purchase order and the delivery challan together; missing even a single page can trigger a request for resubmission, delaying the survey. Adjusters also cross‑check the contractor’s risk register against the claim, so any discrepancy in listed equipment versus claimed loss can be used to reduce the settlement.
Frequently asked questions
How quickly should I report a Contractors All Risk claim?
You should report the incident to your internal risk officer and the insurer’s 24‑hour claims hotline within one hour of discovery. Early reporting demonstrates compliance with policy terms and prevents the insurer from arguing delayed notice, which could lower the payout.
What documents are essential for a Contractors All Risk claim?
Prepare the original policy schedule, risk register, site safety plan, purchase invoices, delivery challans, daily progress logs, subcontractor agreements, and any fire‑department FIR if applicable. A complete packet before the surveyor’s visit reduces back‑and‑forth and speeds settlement.
Can I claim for equipment that is under a loan?
Yes, but you must also inform the financing institution immediately, as loan covenants often require prompt notice of material loss. Failure to do so may trigger a default clause, which can affect both the insurer’s willingness to settle and the loan terms.
क्या मैं ऑनलाइन क्लेम फॉर्म भर सकता हूँ?
हाँ, अधिकांश बीमा कंपनियों के पास 24‑घंटे का ऑनलाइन पोर्टल है जहाँ आप घटना का विवरण, फोटो और दस्तावेज़ अपलोड कर सकते हैं। लेकिन साइट सुरक्षित करने और तुरंत फोन कॉल करने के बाद ही ऑनलाइन फॉर्म भरें, ताकि समय सीमा पूरी हो सके।
What if the insurer’s offer seems low?
If the settlement offer appears low, request a detailed breakdown of the adjustments and compare it with your documented loss. You can engage a loss adjuster or legal advisor to challenge unjustified deductions, and if needed, lodge a formal grievance with the insurer’s ombudsman.
Get a free written policy review at rakshitinsurance.com/#policy-review or WhatsApp +91 92514 56334.
Free policy review · All insurance calculators
Rakshit Financial Services is an IRDAI-registered insurance broker with offices in Udaipur, Jaipur and Mumbai. This article is general information only and is not insurance advice or a solicitation to purchase. Insurance is the subject matter of solicitation. Please read the policy wording, benefits, exclusions and terms carefully before concluding a sale. Cover and eligibility are subject to insurer underwriting.
Tax benefits are subject to change under prevailing tax laws. Please consult your tax advisor.
WhatsApp · LinkedIn · X · Copy link
Insurance for Construction and Infrastructure Projects · Business Interruption Insurance in India · Contractor's All Risk Insurance, India · Fidelity Guarantee: Cover Against Employee Dishonesty
What drives contractors all risk pricing
What is contractors all risk insurance
How a surveyor assesses a commercial claim
Why Indian fire claims are often reduced by the average clause
Business interruption cover for a Rajasthan factory
Why hotel insurance costs what it does